Project Goals
1- To provide a sustainable and safe source of clean drinking water. 2- To reduce diseases associated with the use of contaminated water. 3- To alleviate the suffering of the local community by improving access to water.
- An artesian borehole was drilled to a depth of 100 feet using medium-scale drilling equipment. - The project included the installation of an electric water pump with the necessary piping system, as well as the construction of a 1,000-liter elevated water storage tank. -Number of households in the area: 50 - Estimated number of beneficiaries: 300–500 peopleProject Information
- Status Ongoing
- Project Type BL Borehole
- Location Kholera Village
- Start Date Aug 01, 2026
- End Date Aug 22, 2026
- Sponsor Sheikh Ali Al-hiqbani May Allah forgive him and his parents and descendants